Keep your coil lines, cutting systems, and forming equipment running flawlessly with a season-by-season strategy.
Why a Maintenance Playbook Matters
Downtime is costly with lost production, missed deadlines, and unplanned repair bills can quickly erode margins. A structured preventive maintenance (PM) program turns reactive firefighting into proactive performance management. By following a 12-month calendar, HVAC fabricators can:
- Extend machine life and protect capital investments
- Improve cut quality, part accuracy, and finished duct fitup
- Reduce scrap, rework, and energy consumption
- Maintain a safer work environment
- Schedule service during natural lulls instead of peak production
Below is a practical, season-by-season checklist you can adapt to any shop size. Post it in the maintenance office, share it with line supervisors, and revisit it during monthly toolbox talks.
1. Stabilize, inspect, and plan
Task |
Why It Matters |
Frequency |
Inspect heaters on hydraulic reservoirs and pneumatic lines |
Prevent viscosity changes that starve pumps and cylinders |
Monthly |
Verify coolant and lubricant viscosity for cold starts |
Reduces motor strain and premature wear |
Monthly |
Tighten electrical terminations and check cabinet heaters |
Cold weather contraction can loosen connections |
Monthly |
Calibrate load cells, encoders, and laser optics |
Ensures accuracy before spring ramp up |
January |
Review spare parts inventory for long lead items |
Avoid delays when suppliers shut down for holidays |
December |
Schedule operator refresher training |
Reinforce best practices during slower periods |
February |
2. Clean, refresh, and reset
- Deep clean machine bases, guards, and fume extraction hoods to remove winter dust and metal fines.
- Replace air intake and hydraulic filters; inspect coolant sumps for bacterial growth.
- Check alignment of coil feed lines, straighteners, and servo feeds as thermal expansion over winter can cause drift.
- Inspect forming rolls, dies, and punch tooling for wear; rotate or regrind as needed.
- Update PLC and HMI firmware to the latest OEM releases; back up parameters to secure storage.
- Test emergency stop circuits and light curtains; document results for compliance.
Pro Tip: Use a borescope to inspect inside sealed gearboxes without disassembly.
3. Keep cool and audit performance
Task |
Why It Matters |
Inspect and clean cooling fans, louvers, and heat exchangers on motors, drives, and control cabinets |
Prevents thermal shutdowns during high ambient temps |
Measure spindle and gearbox temperatures with an IR camera |
Identifies bearing wear before failure |
Check belt tension and chain lubrication on conveyors |
Heat accelerates stretch and degradation |
Monitor power consumption and compare to baseline |
Rising amperage may indicate developing issues |
Conduct a mid-year performance audit of cycle times, scrap rates, and OEE |
Quantifies ROI of your PM program |
4. Prepare for peak season and year-end targets
- Hydraulic & Pneumatic Tune Up
- Replace seals and hoses showing dry rot
- Test accumulator pre-charge and relief valve settings
- Lubrication System Flush
- Change oils, grease central manifolds, and verify auto-lube cycle timers
- Backup & Archive
- Copy CNC nests, laser parameters, and rollform recipes to offsite storage
- Safety & Compliance Review
- Audit lockout/tag out procedures and update signage
- Budget & CapEx Planning
- Use maintenance data to justify upgrades or replacements in next year’s budget
5. Monthly Quick-Check List
Add these 30-minute inspections to your supervisor’s calendar:
- Check fluid levels (hydraulic, coolant, lubrication)
- Inspect guards and interlocks
- Verify pressure gauges and flow meters are in spec
- Listen for unusual vibration or noise
- Clean optical sensors and camera lenses
6. Partnering with Mestek Machinery Service & Support
Mestek Machinery offers tiered preventive maintenance agreements that include:
- Certified OEM Technicians – trained on Iowa Precision®, Lockformer®, Engel®, and RotoDie® equipment.
- Predictive Analytics – remote monitoring and vibration analysis to catch failures early.
- Priority Parts Access – guaranteed stock on highwear consumables.
- On-Site Training – customized sessions for operators and maintenance teams.
Ready to build your playbook? Contact our Service Department at service@mestekmachinery.com or call 319.364.9181 to schedule a complimentary PM assessment.
Final Thoughts
A disciplined, 12-month preventive maintenance program is one of the most cost-effective ways to safeguard production, elevate quality, and protect your people. By following the season-by-season checklist above and partnering with Mestek Machinery for expert support, you can ensure your HVAC fabrication equipment stays in peak condition all year long.
Stay proactive, stay productive, and keep fabricating with confidence.